Use this worked example to plan materials before ordering. Adjust the measurements, waste and product specifications for your own project.
Step-by-step calculation
- Measure length and width: For a rectangular slab, use 3 m long and 2 m wide.
- Convert thickness: A thickness of 100 mm is 0.10 m.
- Calculate volume: 3 × 2 × 0.10 = 0.60 m³ of concrete.
- Add a planning allowance: At 10% extra, 0.60 × 1.10 = 0.66 m³.
- Check the supply method: For bagged concrete, divide the required volume by the yield stated on the actual bag, then round up. For ready-mix, confirm the order quantity with the supplier.
Calculate your own project
Enter your measurements and product details to get a personalised estimate.
Open the free calculator →Important checks before buying
This calculation estimates volume only. It does not determine safe slab thickness, reinforcement, ground preparation or structural suitability. Seek qualified advice where needed.
Frequently asked questions
Is this an exact shopping quantity?
No. This is a planning example. Always check product labels, room shape and the supplier's recommendations.
What if my measurements are different?
Use the linked calculator and enter your own dimensions. For irregular rooms, break the area into simple sections and check how waste and whole packs or boxes affect the final order.
Does the example include labour and extras?
No. The example focuses on the main material quantity. Budget separately for fitting, delivery and other supplies.